About Us


Vision,Mission,and Company’s Objective
Vision
To become World-Class Mining Construction company
Mission
To fulfill customer’s requirements with high Quality To provide commitment for continual improvement in all aspects of capability, skill, competency and employee’s quality of life
Company’s Objective
To achieve Zero accident
To increase compliance to legal requirement and others to 100%
To satisfy client by providing the highest quality and value
To grow and develop by using company’s strength and competencies
To develop innovative and useful service and solution
To be able to compete in Globalization market by delivering innovative and useful service and solution
To get customers respect and loyalty
History
1987
PT Epiterma Mas Indonesia was established with Notary Deed No. 15 on 14 March 1987. Now very well known company in steel fabrication construction, material handling equipment and to support excellent products and punctual delivery times. We have experience for over 26 years in domestic and overseas mining projects. To compete with other similiar companies, we have built a strong commitment towards to the customer’s requirements by following International Standard related to the nature of business. In 2009, quality management (ISO 9001:2008) and Health & Safety Management (OHSAS 18001:2007) were implemented to achieve this commitment.
1993
Owner : PT Ampalit Mas Perdana Year : June 1993 – 1995 Project : Fabrication of a gold treatment plant Location : Central Kalimantan, Indonesia Scope of work : Fabricate a 180 cubic meter/hour jig plant for the purposes of extracting recoverable gold from the area (manpower, equipment & fabrication) Primary Circular Jig Secondary Jig Hutch water tank Settling tank Trommel screen Sluice box Kibble gantry Reichert spiral Hutch water pump Piping Electrical Site preparation
1996
Owner : PT Mulia Glass Year : 1996, 1997, 2001 & 2003 Project : Supply of Conveyor A, B, C, D, E, F & G (design, fabrication, mobilization, erection, installation and commissioning/finishing) Supply of 7 (seven) units Belt Conveyor and 2 sets Crusher support Oil tank dia. 3000 mm x 2500mm Scrapper I & II and Chute Cold end conveyor belt Location : Lemah Abang, Cikarang, Indonesia Scope Work : Parts of cullet return conveyor float III common drawing Supply and install of equipment for cullet return conveyor Belt conveyor length from 129 m to 178 m Chute to crusher and crusher to conveyor Changing design of support frame Supply f 1 unit cullet return conveyor (Labour, equipment & fabrication)
2006
Owner : Kansanshi Mining Plc Project : Kansanshi 12 MTPA Year : 2006 – 2014 Location : South Africa Scope of Work : Supply & fabrication of structural steel (Labour, equipment & fabrication)
2008
Owner : Mauritanian Copper Mines Project : Guelb Moghrein Gold Recovery Year : 2008 – 2014 Location : Nouakchott, Congo Scope of Work : Floation structural steelwork & platework (Labour, equipment & installation)
2009
On June 25, 2009, PT. Epiterma Mas Indonesia obtain ISO 9001 : 2008 ( Quality Management System ) Certificate number : JKT6006512 /A – present On November 29, 2009, PT. Epiterma Mas Indonesia obtain OHSAS 18001: 2007 (Occupational Health and Safety Management System Work) Certificate number: JKT606512 / B – present
2011
EPITERMA develops its business by establishing PT Epiterma Mas Construction as its subsidiary company. PT Epiterma Mas Construction was founded in 2011 by Notary Deed No. 1 dated August 18, 2011. Based in Delta Silicon II , Lippo Cikarang and built on a land area of 15.860 sqm. Having maximum 20 tonnes overhead crane SWL. PT Epiterma Mas Konstruksi can produce fabrication of 1,500 tonnes per month with the ability of the delivery capacity of 4 containers per day.PT Epiterma Construction Mas earmarked for the local projects
2012
Owner : Kalumbila Minerals Ltd. Project : Sentinel Year : 2012 – 2015 Location : South Africa Scope of Work : Structural Steel Phase 1 – Mill Building (Labour, equipment & installation)
2015
Our engineers have qualifications in Civil, Structural and Mechanical. It is covering all aspects of project development, from concept generation until installation. The engineers are supported by team of qualified drafters, fully equipped fabrication workshops, experienced administration staffs and experience team of managers. Commitment, professionalism, continual improvement, qualified workers and well equipped workshops allow EPITERMA to have large capability for more complex project and increasing ability to meet demanding time and quality