History
PT Epiterma Mas Indonesia was established with Notary Deed No. 15 on 14 March 1987. Now very well known company in steel fabrication construction, material handling equipment and to support excellent products and punctual delivery times. We have experience for over 26 years in domestic and overseas mining projects. To compete with other similiar companies, we have built a strong commitment towards to the customer’s requirements by following International Standard related to the nature of business. In 2009, quality management (ISO 9001:2008) and Health & Safety Management (OHSAS 18001:2007) were implemented to achieve this commitment. Owner : PT Ampalit Mas Perdana Year : June 1993 – 1995 Project : Fabrication of a gold treatment plant Location : Central Kalimantan, Indonesia Scope of work : Fabricate a 180 cubic meter/hour jig plant for the purposes of extracting recoverable gold from the area (manpower, equipment & fabrication) Primary Circular Jig Secondary Jig Hutch water tank Settling tank Trommel screen Sluice box Kibble gantry Reichert spiral Hutch water pump Piping Electrical Site preparation Owner : PT Mulia Glass Year : 1996, 1997, 2001 & 2003 Project : Supply of Conveyor A, B, C, D, E, F & G (design, fabrication, mobilization, erection, installation and commissioning/finishing) Supply of 7 (seven) units Belt Conveyor and 2 sets Crusher support Oil tank dia. 3000 mm x 2500mm Scrapper I & II and Chute Cold end conveyor belt Location : Lemah Abang, Cikarang, Indonesia Scope Work : Parts of cullet return conveyor float III common drawing Supply and install of equipment for cullet return conveyor Belt conveyor length from 129 m to 178 m Chute to crusher and crusher to conveyor Changing design of support frame Supply f 1 unit cullet return conveyor (Labour, equipment & fabrication) Owner : Kansanshi Mining Plc Project : Kansanshi 12 MTPA Year : 2006 – 2014 Location : South Africa Scope of Work : Supply & fabrication of structural steel (Labour, equipment & fabrication) Owner : Mauritanian Copper Mines Project : Guelb Moghrein Gold Recovery Year : 2008 – 2014 Location : Nouakchott, Congo Scope of Work : Floation structural steelwork & platework (Labour, equipment & installation) On June 25, 2009, PT. Epiterma Mas Indonesia obtain ISO 9001 : 2008 ( Quality Management System ) Certificate number : JKT6006512 /A – present On November 29, 2009, PT. Epiterma Mas Indonesia obtain OHSAS 18001: 2007 (Occupational Health and Safety Management System Work) Certificate number: JKT606512 / B – present EPITERMA develops its business by establishing PT Epiterma Mas Construction as its subsidiary company. PT Epiterma Mas Construction was founded in 2011 by Notary Deed No. 1 dated August 18, 2011. Based in Delta Silicon II , Lippo Cikarang and built on a land area of 15.860 sqm. Having maximum 20 tonnes overhead crane SWL. PT Epiterma Mas Konstruksi can produce fabrication of 1,500 tonnes per month with the ability of the delivery capacity of 4 containers per day.PT Epiterma Construction Mas earmarked for the local projects Owner : Kalumbila Minerals Ltd. Project : Sentinel Year : 2012 – 2015 Location : South Africa Scope of Work : Structural Steel Phase 1 – Mill Building (Labour, equipment & installation) Our engineers have qualifications in Civil, Structural and Mechanical. It is covering all aspects of project development, from concept generation until installation. The engineers are supported by team of qualified drafters, fully equipped fabrication workshops, experienced administration staffs and experience team of managers. Commitment, professionalism, continual improvement, qualified workers and well equipped workshops allow EPITERMA to have large capability for more complex project and increasing ability to meet demanding time and quality
1987
1993
1996
2006
2008
2009
2011
2012
2015